BELOW: Wags the dog, being spoilt inside:
BELOW: The Pool area, and the new under construction retaining wall in the foreground:
BELOW: The view over the side fence:
BELOW: The upper level of the back yard (from east side):
BELOW: The upper level of the back yard (from west side):
BELOW: The retaining wall (under construction):
BELOW: The side panel (west side):
BELOW: Side gate integrated into panel (east side):
No comments:
Post a Comment